Pakistan offshore oil and gas drilling is moving closer to reality after Türkiye’s seismic research vessel Oruç Reis arrived in Karachi, launching a new exploration programme targeting the Indus and Makran offshore basins.
The two countries are targeting exploratory drilling in the fourth quarter of 2027, following seismic surveys designed to identify promising underground hydrocarbon structures. The initiative could reshape Pakistan’s energy exploration efforts, although commercial discoveries remain uncertain.
Pakistan Offshore Oil and Gas Drilling Targets Q4 2027

Pakistan and Türkiye announced the start of offshore seismic exploration on November 20, 2026. The development marks a significant return to offshore exploration after nearly two decades of limited activity and unsuccessful previous attempts.
Turkish Energy Minister Alparslan Bayraktar confirmed that drilling operations are targeted for 2027 at locations identified through geological data. More detailed reporting places the target in the fourth quarter, subject to survey results and subsequent technical assessments.
Türkiye’s Oruç Reis Vessel Begins Offshore Exploration
The Turkish research vessel Oruç Reis arrived at Karachi Port following a 19-day voyage. Its arrival was formally welcomed by senior Pakistani officials, including Deputy Prime Minister Ishaq Dar and Petroleum Minister Ali Pervaiz Malik, alongside Bayraktar.
READ MORE: World’s 3 Most Powerful Countries Set to Meet in China Next Week
The vessel will collect seismic information to assess offshore hydrocarbon potential. This operation represents a transition from previously negotiated energy agreements towards field-level exploration, bringing Turkish technical capabilities into Pakistan’s offshore energy programme.
Indus and Makran Basins Under the Exploration Programme
The exploration programme covers two important offshore geological regions: the Indus and Makran basins. These areas extend along Pakistan’s Arabian Sea coastline and have attracted interest because of their potential hydrocarbon-bearing geological formations.
The initial operation will focus on the Eastern Offshore Indus-C Block, where the vessel will collect three-dimensional seismic data across approximately 670 square kilometres. Further surveys will examine the Makran offshore blocks.
How the 2D and 3D Seismic Surveys Will Work
Seismic surveys help geologists understand underground rock formations by analysing reflected sound waves. Two-dimensional surveys provide geological profiles along individual lines, while three-dimensional surveys produce more detailed representations of subsurface structures.
The initial Indus-C survey is expected to take approximately 52 days. Additional Makran operations involve 2,353 kilometres of survey lines, with data acquisition and interpretation expected to extend across several months.
Key exploration figures:
| Project detail | Target or estimate |
|---|---|
| Indus-C 3D survey | 670 sq km |
Initial survey duration | 52 days |
| Makran survey lines | 2,353 km |
Data collection and interpretation | Up to 6 months |
| Target for drilling | Q4 2027 |
Which Companies Are Participating in Pakistan’s Offshore Project?
The offshore exploration programme involves Turkish Petroleum Corporation and Pakistani energy companies. Its ownership structure brings together international technical participation and local industry experience, creating a joint framework for exploration and potential development.
For the Eastern Offshore Indus-C Block, the reported working interests are distributed among four participating companies. Turkish Petroleum Overseas Company serves as operator, while Pakistani companies retain the majority combined interest in the project.
| Participating company | Working interest |
|---|---|
Turkish Petroleum Overseas Company (TPOC) | 25% |
Pakistan Petroleum Limited (PPL) | 35% |
| Oil and Gas Development Company (OGDCL) | 20% |
Mari Energies | 20% |
| Total | 100% |
Pakistan’s Offshore Exploration History and Previous Failures
Pakistan’s offshore exploration programme has faced substantial challenges over several decades. According to government statements, the country had not conducted a competitive offshore block auction since 2006–07, leaving considerable geological areas unexplored.
The government relaunched its offshore bidding process in 2025, offering 40 blocks across the Indus and Makran basins. The bidding round attracted interest covering 23 blocks and approximately 53,510 square kilometres.
Previous exploration efforts also demonstrate the risks involved. Earlier offshore drilling attempts failed to establish commercially viable discoveries, reinforcing why new geological surveys and careful evaluation are necessary before substantial development investment.
Can Offshore Oil and Gas Reduce Pakistan’s Import Dependence?
Pakistan relies significantly on imported energy to meet domestic demand. Discovering commercially recoverable offshore oil and gas could eventually strengthen domestic supplies, improve energy security and reduce some exposure to international commodity markets.
However, these benefits depend on successful discoveries, production infrastructure, development costs and commercial feasibility. Even a positive drilling result would not automatically translate into immediate reductions in petrol prices, electricity tariffs or energy imports.
The potential benefits extend beyond fuel availability:
Greater domestic energy production.
New opportunities for exploration investment.
Technical knowledge transfer between participating countries.
Potential employment in supporting industries.
Improved long-term energy supply diversification.
Why Commercial Oil and Gas Discovery Is Not Guaranteed
Seismic exploration identifies geological structures that may contain hydrocarbons, but it cannot independently confirm commercially recoverable reserves. Exploratory wells must test promising locations to establish whether oil or natural gas exists in sufficient quantities.
Petroleum Minister Ali Pervaiz Malik emphasised the scientific and financial requirements of offshore exploration, stating: “What lies beneath these waters cannot be known through expectation alone. It requires science, technology, sustained investment and, above all, the courage to explore.”
This distinction matters because offshore drilling is capital-intensive and technically demanding. Geological uncertainty, operational challenges and the cost of developing discovered resources can all affect whether an exploration project becomes commercially successful.
What Happens Before the First Offshore Drilling Operation?
The immediate priority is collecting and interpreting seismic data from the selected exploration areas. Geological specialists will examine the findings to identify structures that justify further investigation and potentially support the selection of exploratory drilling locations.
The Turkish government has confirmed that its objective is to begin drilling next year at locations identified through the survey. Nevertheless, final operational decisions will depend on technical findings, project preparations and the necessary investment commitments.
The expected sequence includes:
Completion of offshore seismic surveys.
Processing and interpretation of geological data.
Identification of promising drilling locations.
Technical and commercial evaluation.
Preparations for exploratory drilling.
What the Pakistan-Türkiye Energy Partnership Means for 2027
The partnership reflects growing cooperation between Pakistan and Türkiye in energy exploration and technical development. Beyond offshore hydrocarbons, the November 2026 visit also produced three agreements concerning mineral exploration, geological research and technical cooperation.
Bayraktar said Türkiye wanted to contribute its engineering experience to Pakistan’s energy sector. He also highlighted Türkiye’s own offshore gas development experience, describing cooperation as an opportunity to strengthen energy security in both countries.
For Pakistan, the coming months will be critical in determining whether geological prospects translate into viable drilling targets. The 2027 timetable represents an important project milestone, but its ultimate value will depend on measurable exploration results rather than expectations.
Pakistan’s Offshore Energy Future Depends on Exploration Results
The arrival of Oruç Reis has restarted an important chapter in Pakistan’s offshore energy ambitions. The planned surveys offer an opportunity to investigate underexplored areas using advanced seismic technology and international technical cooperation.
However, Pakistan’s energy outlook will only change substantially if exploratory drilling confirms commercially recoverable reserves. Until then, the project should be viewed as a promising exploration initiative rather than a confirmed breakthrough in domestic oil and gas production.





